Ludlow, VT - Reservoir Pond Dam Improvements
Stockbridge, VT – Ranney Road Bridge Replacement
Winchester, NH – Broad Brook Road Bridge Rehabilitation
West Windsor, VT – Route 44 Bridge Deck Replacements
Winhall, VT – Route 30 Culvert Rehabilitation
Strafford, VT – White Road Bridge Replacement
Orford, NH – Archertown Road Bridge Replacement
Bennington, VT – Coleville Road Bridge Replacement
Newbury, VT – Interstate 91 Southbound Culvert Rehabilitation
West Windsor, VT – Emergency Culvert Replacement on Hartland Brownsville Road
Williston – Interstate 89 Concrete Pier Repairs
Installation of an 8 foot diameter x 163 foot long slipline culvert, a new reinforced concrete headwall and a series of stone weirs to serve as a fish ladder.
Precasting and installation of reinforced concrete abutments and installation of a Contech supplied prefabricated pedestrian bridge.
Installation of a 75 foot long temporary bridge, construction of a new reinforced concrete abutment anchored to ledge, fabrication and installation of a steel beam superstructure and placement of a new reinforced concrete bridge deck.
Teamed with Eckman Engineering, this Design – Build project incorporated reinforced concrete abutments anchored to ledge, a reinforced concrete slab superstructure and concrete curbs to contain a gravel roadway surface for simplified grading operations.
This bridge replacement project included stay-in-place sheet pile cofferdams, reinforced concrete abutments, a composite steel beam/concrete deck superstructure, granite curbing, membrane, paving, and guardrail.
Ludlow, VT - Reservoir Pond Dam Improvements
Stockbridge, VT – Ranney Road Bridge Replacement
Winchester, NH – Broad Brook Road Bridge Rehabilitation
West Windsor, VT – Route 44 Bridge Deck Replacements
Winhall, VT – Route 30 Culvert Rehabilitation
Strafford, VT – White Road Bridge Replacement
Orford, NH – Archertown Road Bridge Replacement
Bennington, VT – Coleville Road Bridge Replacement
Newbury, VT – Interstate 91 Southbound Culvert Rehabilitation
West Windsor, VT – Emergency Culvert Replacement on Hartland Brownsville Road
Williston – Interstate 89 Concrete Pier Repairs
Installation of an 8 foot diameter x 163 foot long slipline culvert, a new reinforced concrete headwall and a series of stone weirs to serve as a fish ladder.
Precasting and installation of reinforced concrete abutments and installation of a Contech supplied prefabricated pedestrian bridge.
Installation of a 75 foot long temporary bridge, construction of a new reinforced concrete abutment anchored to ledge, fabrication and installation of a steel beam superstructure and placement of a new reinforced concrete bridge deck.
Teamed with Eckman Engineering, this Design – Build project incorporated reinforced concrete abutments anchored to ledge, a reinforced concrete slab superstructure and concrete curbs to contain a gravel roadway surface for simplified grading operations.
This bridge replacement project included stay-in-place sheet pile cofferdams, reinforced concrete abutments, a composite steel beam/concrete deck superstructure, granite curbing, membrane, paving, and guardrail.